§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT E3, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Building report
850 East 31st Street
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1930
- Units
- 71
- Owner of record
- PETER STUYVESANTS APTS INC
- Open HPD violations
- 10
- HPD records on file
- 758
Violations at 850 East 31st Street
758 on record§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT E2, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT D11, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT E3, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Who owns 850 East 31st Street?
Owner of record: PETER STUYVESANTS APTS INC. An owner name can come from an earlier filing. Compare the latest HPD registration with the recorded deed before relying on it.
Apartments at 850 East 31st Street
Recorded residential units: 71. Recorded year built: 1930. These building facts do not show current vacancies or when a particular apartment was renovated.
This tax lot appears in the RGB list based on 2024 building registrations, published as of November 2025. That is a building-level historical signal; it does not identify which apartments are stabilized today. Check the official rent-stabilized building lists.
Look up more about this building
See the full record for 850 East 31st Street
The full report includes the grade, all 758 violations with dates and outcomes, housing court filings and ownership details.
- 01Overall grade and scores by category
- 02Details for all 758 HPD violations
- 03Housing court filings and outcomes
- 04Ownership history and LLC connections
