§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE CEILING LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY
Apartment report
15 Albion Place, Apt 1FL
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1899
- Units
- 1
- Owner of record
- 15 ALBION PLACE VENTURES LLC
- Open HPD violations
- 5
- HPD records on file
- 6
Violations at 15 Albion Place, Apt 1FL
6 on record§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1FL, 1st STORY
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES FLOOR IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE CEILING LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 1FL, 1st STORY
See the full record for 15 Albion Place, Apt 1FL
The complete report unlocks the grade, all 6 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 6 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
