§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE WINDOW RECESS AT WEST AT MID LEVEL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
103 Holland Avenue, Apt 103
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1974
- Units
- 536
- Owner of record
- NORTH SHORE HOUSES PRESERVATION, INC.
- Open HPD violations
- 2
- HPD records on file
- 20
Violations at 103 Holland Avenue, Apt 103
20 on record§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE AT MID LEVEL IN THE BATHROOM LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT CEILING AT MID LEVEL IN THE BATHROOM LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT CLOSET AT NORTH AT MID LEVEL IN THE PRIVATE HALLWAY LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET AT NORTH AT MID LEVEL IN THE PRIVATE HALLWAY LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE AT MID LEVEL IN THE BATHROOM LOCATED AT APT 103, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 103 Holland Avenue, Apt 103
The complete report unlocks the grade, all 20 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 20 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
