SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 29R, 1st STORY
Apartment report
25 Fairway Avenue, Apt 29R
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1950
- Units
- 36
- Owner of record
- FAIRWAY HOUSING ASSOC
- Open HPD violations
- 2
- HPD records on file
- 5
Violations at 25 Fairway Avenue, Apt 29R
5 on recordSECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 29R, 1st STORY
SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE BATHROOM LOCATED AT APT 29R, 1st STORY
SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 29R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WEST WALL IN THE BATHROOM LOCATED AT APT 29R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 29R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 25 Fairway Avenue, Apt 29R
The complete report unlocks the grade, all 5 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 5 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
