§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK , CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
194-15 Nashville Boulevard, Apt 2FL
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1930
- Units
- 2
- Owner of record
- LAVACHE, JEAN
- Open HPD violations
- 7
- HPD records on file
- 10
Violations at 194-15 Nashville Boulevard, Apt 2FL
10 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 7; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK , CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 194-15 Nashville Boulevard, Apt 2FL
The complete report unlocks the grade, all 10 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 10 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
