SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER 1ST ROOM FROM EAST LOCATED AT APT PVT, 2nd STORY, APARTMENT AT WEST
Building report
112-38 205th Street
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1935
- Units
- 1
- Owner of record
- FRANCIS, PAULETTE SUSAN
- Open HPD violations
- 10
- HPD records on file
- 10
Violations at 112-38 205th Street
10 on recordSECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 12; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT PVT, APARTMENT AT WEST
SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT PVT, APARTMENT AT WEST
SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT PVT, 1st STORY, APARTMENT AT WEST
SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING HAND RAILING ENTRANCE TO BUILDING
SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 12; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT PVT, APARTMENT AT WEST
See the full record for 112-38 205th Street
The complete report unlocks the grade, all 10 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 10 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
