§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
130-25 129th Street, Apt 2
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 2025
- Units
- 2
- Owner of record
- SINGH, AMRIK
- Open HPD violations
- 34
- HPD records on file
- 36
Violations at 130-25 129th Street, Apt 2
36 on record§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AQUISTIC TILES AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR ON SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS AT WINDOW LOWER SASH ON SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 130-25 129th Street, Apt 2
The complete report unlocks the grade, all 36 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 36 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
