SECTION 27-2005 ADM CODE REFIT WOODEN CLOSET DOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
114-11 95th Avenue, Apt 3R
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1930
- Units
- 6
- Owner of record
- ROOPNARAINE , SHIREENA
- Open HPD violations
- 2
- HPD records on file
- 16
Violations at 114-11 95th Avenue, Apt 3R
16 on recordSECTION 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 0; WG TO REPAIR = 4; IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3; WG TO REPLACE = 0; WG TO REPAIR = 4; LOCATED AT APT 3R, 3rd STORY
SECTION 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE 1st ENTIRE APARTMENT FROM EAST LOCATED AT APT 3R, 3rd STORY
See the full record for 114-11 95th Avenue, Apt 3R
The complete report unlocks the grade, all 16 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 16 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
