§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
150-16 73rd Avenue, Apt 2E
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1950
- Units
- 144
- Owner of record
- KEW GARDENS HILLS, LLC
- Open HPD violations
- 9
- HPD records on file
- 33
Violations at 150-16 73rd Avenue, Apt 2E
33 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE METAL DOOR IN THE ENTRANCE LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET PLATE COVER AT WEST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RECAULK AROUND THE COUNTER TOP AT SINK IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RECAULK AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 150-16 73rd Avenue, Apt 2E
The complete report unlocks the grade, all 33 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 33 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
