§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
148-25 88th Avenue, Apt 3F
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1927
- Units
- 78
- Owner of record
- AMBASSADOR APTS INC
- Open HPD violations
- 9
- HPD records on file
- 9
Violations at 148-25 88th Avenue, Apt 3F
9 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER WINDOW SASH INTERNAL GLASS PANE THE SECOND WINDOW FROM EAST AT SOUTH IN THE 3rd ROOM FROM EAST LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC TILE AT EAST WALL IN THE BATHROOM LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 148-25 88th Avenue, Apt 3F
The complete report unlocks the grade, all 9 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 9 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
