§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6V, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Apartment report
65-09 99th Street, Apt 6V
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1946
- Units
- 130
- Owner of record
- 65-09 99TH STREET, LLC
- Open HPD violations
- 12
- HPD records on file
- 51
Violations at 65-09 99th Street, Apt 6V
51 on record§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6V, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 ADM CODE REFIT LOWER &UPPER WINDOW SASHES IN THE ENTIRE APARTMENT LOCATED AT APT 6V, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT SOUTH WALL CLOSET IN THE FOYER LOCATED AT APT 6V, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6V, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 40 SQ FT AT WALLS AND CEILINGS AT THE FIRST AND SECOND CLOSETS AT NORTH IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6V, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
See the full record for 65-09 99th Street, Apt 6V
The complete report unlocks the grade, all 51 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 51 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
