§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
25-33 94th Street, Apt 1F
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1920
- Units
- 6
- Owner of record
- 25-31/33 94TH STREET LLC
- Open HPD violations
- 7
- HPD records on file
- 15
Violations at 25-33 94th Street, Apt 1F
15 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CONTROL AIR VALVE AT RADIATOR AT EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATOR VALVE CAP AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CONSISTING OF APPROXIMATELY 11 SQUARE FEET AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 25-33 94th Street, Apt 1F
The complete report unlocks the grade, all 15 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 15 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
