§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16997179 ISSUED 24-MAY-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
Building report
123-12 9th Avenue
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1935
- Units
- 2
- Owner of record
- ZHANG, CHUNYAN
- Open HPD violations
- 3
- HPD records on file
- 4
Violations at 123-12 9th Avenue
4 on record§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE 1st ROOM FROM NORTH, THE PRIVATE HALLWAY , THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16997179 ISSUED 24-MAY-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
See the full record for 123-12 9th Avenue
The complete report unlocks the grade, all 4 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 4 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
