§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST, THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apartment report
80-39 249th Street, Apt 2
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1940
- Units
- 1
- Owner of record
- AMINYAR, FRIBA
- Open HPD violations
- 1
- HPD records on file
- 5
Violations at 80-39 249th Street, Apt 2
5 on record§ 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT THE WASH BASIN IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT THE WASH BASIN IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
See the full record for 80-39 249th Street, Apt 2
The complete report unlocks the grade, all 5 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 5 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
