§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING EAST, WEST NORTH AND SOUTH WALL APPROX 25 SQ FT IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Building report
33-27 29th Street
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1965
- Units
- 3
- Owner of record
- ANG, LEE
- Open HPD violations
- 2
- HPD records on file
- 20
Violations at 33-27 29th Street
20 on record§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 35 SQ FT AT CEILING, 15 SQ FT AT SOUTH WALL, 20 SQ FT AT EAST WALL, 15 SQ FT AT WEST WALL, 25 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
See the full record for 33-27 29th Street
The complete report unlocks the grade, all 20 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 20 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
