§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
342 Ft Washington Avenue, Apt 3C
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1923
- Units
- 48
- Owner of record
- 344 FORT WASHINGTON AVENUE, LLC
- Open HPD violations
- 11
- HPD records on file
- 25
Violations at 342 Ft Washington Avenue, Apt 3C
25 on record§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 3C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 342 Ft Washington Avenue, Apt 3C
The complete report unlocks the grade, all 25 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 25 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
