§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apartment report
517 West 212th Street, Apt 2B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1925
- Units
- 44
- Owner of record
- HP CSP GF1 HOUSING DEVELOPMENT FUND COMP ANY, INC.
- Open HPD violations
- 1
- HPD records on file
- 32
Violations at 517 West 212th Street, Apt 2B
32 on record§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH 2ND WINDOW AT WEST IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX (7 SQ FT) AT WEST WALL. (7 SQ FT) AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 517 West 212th Street, Apt 2B
The complete report unlocks the grade, all 32 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 32 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
