§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apartment report
65 West 68th Street, Apt 1
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1894
- Units
- 10
- Owner of record
- 65 WEST 68TH STREET, LLC
- Open HPD violations
- 3
- HPD records on file
- 9
Violations at 65 West 68th Street, Apt 1
9 on record§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SINK BASE CABINET WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
See the full record for 65 West 68th Street, Apt 1
The complete report unlocks the grade, all 9 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 9 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
