§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE FOYER LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
538 West 145th Street, Apt 2H
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1905
- Units
- 44
- Owner of record
- 540 WEST 145 LLC.
- Open HPD violations
- 7
- HPD records on file
- 7
Violations at 538 West 145th Street, Apt 2H
7 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE, AT EAST WALL. IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING, APPROX. 2 SQ. FT. AT SOUTH WALL APPROX. 2 SQ. FT. IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE FOYER LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 538 West 145th Street, Apt 2H
The complete report unlocks the grade, all 7 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 7 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
