§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 19A, 19th STORY, 2nd APARTMENT FROM NORTH AT EAST
Apartment report
145 East 16th Street, Apt 19A
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1963
- Units
- 231
- Owner of record
- 145 EAST 16TH STREET
- Open HPD violations
- 1
- HPD records on file
- 5
Violations at 145 East 16th Street, Apt 19A
5 on record§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 19A, 19th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD PARQUET FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 19A, 19th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 19A, 19th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 19A, 19th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 19A, 19th STORY, 2nd APARTMENT FROM NORTH AT EAST
See the full record for 145 East 16th Street, Apt 19A
The complete report unlocks the grade, all 5 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 5 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
