§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER PIPE AT EAST IN THE KITCHEN LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
312 East 9th Street, Apt 11
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1910
- Units
- 16
- Owner of record
- HIGHPOINT DEVELOPERS
- Open HPD violations
- 3
- HPD records on file
- 32
Violations at 312 East 9th Street, Apt 11
32 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE KITCHEN LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT THE FLOOR IN THE BATHROOM LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT THE FLOOR IN THE BATHROOM LOCATED AT APT 11, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 312 East 9th Street, Apt 11
The complete report unlocks the grade, all 32 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 32 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
