§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LATCH SET IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 30K, 30th STORY, 1st APARTMENT FROM NORTH AT EAST
Building report
50 East 112th Street
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 2022
- Units
- 347
- Owner of record
- ACACIA SENDERO VERDE HOUSING DEV FUND CO INC.
- Open HPD violations
- 12
- HPD records on file
- 27
Violations at 50 East 112th Street
27 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LATCH SET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 30K, 30th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 30K, 30th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM AND BUZZER RETURN SYSTEM AT FOYER WEST WALL LOCATED AT APT 27K, 27th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 27K, 27th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM AND BUZZER RETURN SYSTEM AT FOYER WEST WALL LOCATED AT APT 27K, 27th STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 50 East 112th Street
The complete report unlocks the grade, all 27 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 27 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
