§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
Apartment report
169 East 109th Street, Apt 5G
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 2002
- Units
- 44
- Owner of record
- HOPE FOUNDERS, L.P.
- Open HPD violations
- 4
- HPD records on file
- 12
Violations at 169 East 109th Street, Apt 5G
12 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE FOYER LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
See the full record for 169 East 109th Street, Apt 5G
The complete report unlocks the grade, all 12 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 12 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
