§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTEPIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Apartment report
240 East 119th Street, Apt 2C
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1900
- Units
- 33
- Owner of record
- SOBRO HARLEM HOUSING
- Open HPD violations
- 10
- HPD records on file
- 30
Violations at 240 East 119th Street, Apt 2C
30 on record§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT THE WASTE LINE UNDER THE BASIN SINK IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING ,THE NORTH WALL AND THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 240 East 119th Street, Apt 2C
The complete report unlocks the grade, all 30 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 30 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
