§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC TILE GROUT JOINTS AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
581 East 94th Street, Apt 1FLOOR
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1920
- Units
- 3
- Owner of record
- CMG GROUP HOLDINGS LLC
- Open HPD violations
- 6
- HPD records on file
- 6
Violations at 581 East 94th Street, Apt 1FLOOR
6 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS DOOR AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH AND EAST WALL IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADMIN. CODE: REFIT DOOR AT CLOSET IN THE 4th ROOM FROM EAST LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS DOOR AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 1FLOOR, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 581 East 94th Street, Apt 1FLOOR
The complete report unlocks the grade, all 6 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 6 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
