§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO VOLUME IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Building report
4 Jardine Place
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1920
- Units
- 2
- Owner of record
- MERZIUS, JAIRZINHO
- Open HPD violations
- 19
- HPD records on file
- 19
Violations at 4 Jardine Place
19 on record§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES NO VOLUME IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2026 ADMIN. CODE: REPLACE THE BROKEN OR DEFECTIVE FAUCET AT BATHTUB IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
See the full record for 4 Jardine Place
The complete report unlocks the grade, all 19 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 19 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
