§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
1382 Eastern Parkway Extension, Apt 2
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1921
- Units
- 2
- Owner of record
- 1382 EASTERN PARKWAY REALTY LTD.
- Open HPD violations
- 5
- HPD records on file
- 7
Violations at 1382 Eastern Parkway Extension, Apt 2
7 on record§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT THE FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT THE FLOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 1382 Eastern Parkway Extension, Apt 2
The complete report unlocks the grade, all 7 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 7 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
