SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CONCEALED LEAK IN CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT PVTH, 2nd STORY, APARTMENT AT NORTH
Building report
518 East 29th Street
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1915
- Units
- 1
- Owner of record
- GROUP 91 CORP
- Open HPD violations
- 4
- HPD records on file
- 4
Violations at 518 East 29th Street
4 on recordSECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE ENTIRE APARTMENT LOCATED AT APT PVTH, 2nd STORY, APARTMENT AT NORTH
SECTION 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION PIPE UNDER BATHROOM SINK IN THE BATHROOM LOCATED AT APT PVTH, 2nd STORY, APARTMENT AT NORTH
SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS HOT AND COLD IN THE BATHROOM LOCATED AT APT PVTH, 2nd STORY, APARTMENT AT NORTH
SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CONCEALED LEAK IN CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT PVTH, 2nd STORY, APARTMENT AT NORTH
See the full record for 518 East 29th Street
The complete report unlocks the grade, all 4 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 4 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
