§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DOOR IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
950 Dumont Avenue, Apt 3B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1930
- Units
- 6
- Owner of record
- MHANY DUMONT HOUSING DEVELOPMENT FUND CO RPORATION
- Open HPD violations
- 4
- HPD records on file
- 10
Violations at 950 Dumont Avenue, Apt 3B
10 on record§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISHED METHOD BY REGLAZING AT BATH TUB IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR APPROX 2SQ FT OF UNKEYED PLASTER AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ...SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR APPROX 2SQ FT OF UNKEYED PLASTER AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 950 Dumont Avenue, Apt 3B
The complete report unlocks the grade, all 10 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 10 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
