SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Building report
1145 Glenmore Avenue
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 1930
- Units
- 3
- Owner of record
- BRADSHAW, AMANDA
- Open HPD violations
- 61
- HPD records on file
- 61
Violations at 1145 Glenmore Avenue
61 on recordSECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE TOP AND BOTTOM WINDOW SASH IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY
SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY
SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK AT ENTRANCE DOOR LOCATED AT APT 2, 2nd STORY, APARTMENT AT WEST
See the full record for 1145 Glenmore Avenue
The complete report unlocks the grade, all 61 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 61 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
