§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT NORTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apartment report
186 Franklin Avenue, Apt 1STFL
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 2009
- Units
- 4
- Owner of record
- UNAVAILABLE OWNER
- Open HPD violations
- 10
- HPD records on file
- 15
Violations at 186 Franklin Avenue, Apt 1STFL
15 on record§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st WINDOW SASH FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st BASE CABINET FROM WEST AT NORTH WALL, CEILING, 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL, NORTH WALL, EAST WALL, WEST WALL, 1st WALL CABINET FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR , WEST WALL, CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1STFL, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 186 Franklin Avenue, Apt 1STFL
The complete report unlocks the grade, all 15 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 15 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
