§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Building report
290 Conklin Avenue
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 2006
- Units
- 3
- Owner of record
- 290 CONCKLIN AVE INVESTICO INC.
- Open HPD violations
- 62
- HPD records on file
- 85
Violations at 290 Conklin Avenue
85 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM BUZZERS FROM BUILDING ENTRANCE TO BELL P-ANEL AT EAST WALL IN THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLER AT BOILER ROOM
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLER AT BOILER ROOM
See the full record for 290 Conklin Avenue
The complete report unlocks the grade, all 85 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 85 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
