§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, APARTMENT AT NORTH
Apartment report
149 Starr Street, Apt 3B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1931
- Units
- 8
- Owner of record
- WEST BUSHWICK NRP HOUSING DEVELOPMENT FU ND CORP.
- Open HPD violations
- 9
- HPD records on file
- 22
Violations at 149 Starr Street, Apt 3B
22 on record§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, APARTMENT AT NORTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, APARTMENT AT NORTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, APARTMENT AT NORTH
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, APARTMENT AT NORTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, APARTMENT AT NORTH
See the full record for 149 Starr Street, Apt 3B
The complete report unlocks the grade, all 22 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 22 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
