§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WEST WALL CERAMIC TILES IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Building report
1695 Banyer Place
Public records for this building, including violations, complaints, housing court cases and ownership details.
- Built
- 2008
- Units
- 8
- Owner of record
- FBC REALTY LLC
- Open HPD violations
- 77
- HPD records on file
- 88
Violations at 1695 Banyer Place
88 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING LESS THAN 10 SQ. FT IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 1695 Banyer Place
The complete report unlocks the grade, all 88 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 88 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
