§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
900 Lydig Avenue, Apt 1B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1959
- Units
- 92
- Owner of record
- 900 LYDIG, LLC
- Open HPD violations
- 16
- HPD records on file
- 55
Violations at 900 Lydig Avenue, Apt 1B
55 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30SQ FT AT NORTH AND EAST WALLS AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQUARE FEET AT CEILING AND NORTH AND EAST WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST
See the full record for 900 Lydig Avenue, Apt 1B
The complete report unlocks the grade, all 55 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 55 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
