§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH LOCATED AT APT 11B, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Apartment report
1579 Metropolitan Avenue, Apt 11B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1940
- Units
- 3857
- Owner of record
- PPC RESIDENTIAL, LLC
- Open HPD violations
- 3
- HPD records on file
- 3
Violations at 1579 Metropolitan Avenue, Apt 11B
3 on record§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 11B, 12th STORY, 3rd APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE BATHROOM LOCATED AT APT 11B, 12th STORY, 3rd APARTMENT FROM NORTH AT EAST
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQFT AT WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 11B, 12th STORY, 1st APARTMENT FROM SOUTH AT WEST
See the full record for 1579 Metropolitan Avenue, Apt 11B
The complete report unlocks the grade, all 3 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 3 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
