§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND NORTH WALL 2 SQ.FT. IN CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 14424133 ISSUED 05-JUL-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
Apartment report
546 East 145th Street, Apt 3B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1906
- Units
- 13
- Owner of record
- BROOK WILLIS LLC
- Open HPD violations
- 1
- HPD records on file
- 7
Violations at 546 East 145th Street, Apt 3B
7 on record§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND NORTH WALL 2 SQ.FT. IN CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REFIT DOOR AT ENTRANCE IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 546 East 145th Street, Apt 3B
The complete report unlocks the grade, all 7 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 7 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
