§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apartment report
779 Melrose Avenue, Apt 2B
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 2008
- Units
- 84
- Owner of record
- EL JARDIN DE SELINE HDFC, INC.
- Open HPD violations
- 1
- HPD records on file
- 21
Violations at 779 Melrose Avenue, Apt 2B
21 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC LIGHT SWITCH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC LIGHT SWITCH AT WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT NORTH AND WEST WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCKSET AT DOOR IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
See the full record for 779 Melrose Avenue, Apt 2B
The complete report unlocks the grade, all 21 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 21 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
