§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION 220 VOLT LINE INSTALLED TO ACCOMMODATE ELECTRIC RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
413 East 154th Street, Apt 3R
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1927
- Units
- 6
- Owner of record
- LIGHT HOLDING ENTERPRISES LLC
- Open HPD violations
- 1
- HPD records on file
- 11
Violations at 413 East 154th Street, Apt 3R
11 on record§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE 5th ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES GAS RANGE IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 413 East 154th Street, Apt 3R
The complete report unlocks the grade, all 11 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 11 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
