§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
340 East 148th Street, Apt 3
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1931
- Units
- 8
- Owner of record
- ASSOCIATES 26 LLC
- Open HPD violations
- 27
- HPD records on file
- 115
Violations at 340 East 148th Street, Apt 3
115 on record§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM FROM BUILDING ENTRANCE TO WEST WALL IN THE FOYER LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AY CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING VINYL FLOOR TILES (CAUSING A TRIP HAZARD) IN THE KITCHEN LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
See the full record for 340 East 148th Street, Apt 3
The complete report unlocks the grade, all 115 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 115 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
