§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, PRESUMED LEAD PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apartment report
733 Arnow Avenue, Apt 4D
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1931
- Units
- 52
- Owner of record
- UPORT LLC
- Open HPD violations
- 2
- HPD records on file
- 15
Violations at 733 Arnow Avenue, Apt 4D
15 on record§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQFT AT 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE FOYER , THE BATHROOM LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''733''
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, PRESUMED LEAD PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
See the full record for 733 Arnow Avenue, Apt 4D
The complete report unlocks the grade, all 15 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 15 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
