§ 27-2005 ADMIN. CODE: MAKE SAFE BY PROPERLY REPAIRING THE STRUCTURAL DEFECT. FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apartment report
2724 Cruger Avenue, Apt 1ST
Public records for this unit and the building around it, including violations, complaints, housing court cases and ownership details.
- Built
- 1925
- Units
- 2
- Owner of record
- LAOR, RAMI
- Open HPD violations
- 6
- HPD records on file
- 9
Violations at 2724 Cruger Avenue, Apt 1ST
9 on record§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 1ST, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
See the full record for 2724 Cruger Avenue, Apt 1ST
The complete report unlocks the grade, all 9 violations with dates and outcomes, housing court filings, and ownership details.
- 01Apartment grade and sub-scores
- 02All 9 HPD violations, in full
- 03Housing court filings and outcomes
- 04Ownership and LLC chain
